dc.contributor.advisor | Kontesis, Konstantinos | |
dc.contributor.advisor | Spyridakos, Athanasios | |
dc.contributor.advisor | Koutsogeorgis, Chris N. | |
dc.contributor.author | Patsourakis, Ioannis | |
dc.date.accessioned | 2013-10-15T08:16:09Z | |
dc.date.available | 2013-10-15T08:16:09Z | |
dc.date.issued | 2009-06 | |
dc.identifier.uri | http://okeanis.lib2.uniwa.gr/xmlui/handle/123456789/579 | |
dc.description.abstract | This thesis shows what needs to be done in order to have a
proper project plan and what are the steps to be taken throughout
the project that will lead to its success.
The project presented here has been a novel project for
Greece and that means that due to its complexities and unforeseen
risk factors it crashed, mainly because of an unsuitable project
plan. Through this thesis, the mistakes that were made in the
duration of the project are made clear.
The project mentioned is the design and installation of
photovoltaic units on board a ship and the thesis presents the
model project plan that could not only have been used for the
project to be saved but can also be utilized as a valuable
helping tool for future similar projects. | el |
dc.format.extent | 65 p. | el |
dc.language.iso | en | el |
dc.publisher | ΤΕΙ Πειραιά | el |
dc.publisher | City University of Seattle | el |
dc.rights | Αναφορά Δημιουργού-Μη Εμπορική Χρήση-Όχι Παράγωγα Έργα 3.0 Ελλάδα | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/gr/ | * |
dc.subject | TPSH::Διοίκηση και Οργάνωση::Διαχείριση Έργου (Project Management) | el |
dc.title | Insufficient project planning of the design and installation of photovoltaic units on board a ship may lead to the failure of the project | el |
dc.type | Μεταπτυχιακή εργασία | el |
dc.contributor.master | MSc Project Management | el |
dc.subject.keyword | Insufficient project planning | el |
dc.subject.keyword | Photovoltaic Units | el |